Minnesota B&B Blog

The Paul Bunyan Bike Trail Update

DSC_0361

Sand, Sand, more Sand..................on the Paul Bunyan Trail

The trucks are lined up waiting their turn to take their turn to add one more load of sand on the Paul Bunyan Train in preparation for the pavement soon to be applied.

This entry was posted in . Bookmark the permalink. Post a comment or leave a trackback: Trackback URL.

Post a Comment

You must be logged in to post a comment.

620 Ramsey Street
Hastings, MN 55033
Call: 651-438-7499
Fax: 651.437.4129
Email Us